April 2007 Mc Arthur River Mine Airport - Design and construct complete airfield lighting system,
This was truly a very exiting project to be involved with. Xstrata wanted to construct a 2500metre x30 metre runway capable of taking 737's in twelve weeks.
Airport Electrical played a cruitial role in this project and achieved commissioning on time.
This was a Design and Construct project and included.
Installation of a dual pit and duct system
Installation of interleaved MIRL runway and taxiway lighting
Installation of double sided PAPI and Aerodrome Beacon
Installation of airfield lighting control system and Constant Current Regulators and Pilot Activated Lighting (PAL)
Installation of Generator for Standby Power
Commissioning to MOS 139