HMAS Albatross Nowra

July 2000 HMAS Albatross Nowra Airport -  Consultant for Airport Lighting Upgrade Department of Defence 

Airport Electrical was engaged by O'Donell Griffen to provide advise on AGL installation tecniques.

Airport Electrical had limited control over the whole process and a lot of rework had to occur.

 

January 2002 HMAS Albatross Nowra Airport -  Consultant for Airport Lighting Upgrade Department of Defence 

Airport Electrical was engaged by Heyday / Bovis Lend Lease to undertake the installation of Runway and taxiway lighting.

We were chosen for the project to ensure that the Department of Defence received a high quality product at the end of the day.

The project was completed on time and within budget.

Value Added. Our contract with Heyday allowed us to act as an independent auditor. We had complete control over the quality of work undertaken by Heyday and therefore were able ensure that the Department of Defence received best value for money. 

July 2003 HMAS Albatross Nowra Airport -  Design taxiway centreline lights from Defence base to Nowra Technology Park

Installation of Taxiway Centreline lights Nowra Technology Park.

Connect up independant power supply for Taxiway Lights.

Install pilot activated lighting.PAL

Test and commission new lighting system.

 

Back to projects