November 2018 Olympic Dam Airport Installation of LED Runway Lighting
Install LED Runway Lights
Replace Existing SITs and cables
Test and Commission
November 2018 Olympic Dam Airport 12 monthly Technical Inspection
Carried out 12 monthly Technical Inspection of the AGL equipment as per CASR 139.235-1. & CASR 139.240-2(b)
Provided condition assessment report of all AGL equipment.
Reviewed compliance of AGL equipment and provided written statement for inclusion in the Aerodrome Manual.
Levelled and cleaned PAPI boxes.
Inspected Runway and Taxiway Lighting.
Tested photometric performance of Apron Floodlighting.
Reviewed the Aerodrome Manual and offered suggested improvements.
Made recommendations to improve reliability of AGL system and rectify any Non-compliances.
Provided budgetary pricing for future upgrades
Carried out 12 monthly Technical Inspection of the AGL equipment as per CASR 139.235-1. & CASR 139.240-2(b)
Provided condition assessment report of all AGL equipment.
Reviewed compliance of AGL equipment and provided written statement for inclusion in the Aerodrome Manual.
Levelled and cleaned PAPI boxes.
Inspected Runway and Taxiway Lighting.
Tested photometric performance of Apron Floodlighting.
Reviewed the Aerodrome Manual and offered suggested improvements.
Made recommendations to improve reliability of AGL system and rectify any Non-compliances.
November 2013 Olympic Dam Airport - Installation of IWDI Lighting
Replace the parafloods on the existing IWDI with a fitting that will achieve compliance with the new CASA requirements for IWDIs.
Procure equipment needed.
Installed new LED lights on IWDI
Tested and commissioned.
August 2011 Olympic Dam Airport - BHP Installation of PAPI and new AGL control system.
Design PAPI location to suit a Fokker 50 taking into account the unusual slope of the runway.
Design and install new Airport Lighting Control system with Pilot Activated Lighting controller (PALC)
Review the local areas of significance and avoid these where possible when trenching.
Installation of pit and duct system
Installation of PAPI foundations.
Installation of PAPI
Test commission and flight check of PAPI and PAL.
November 2011 to 2017 Olympic Dam Airport - Audit and Condition assessment of Airfield Ground Lighting
Carried out 12 monthly Technical Inspection of the AGL equipment as per CASR 139.235-1. & CASR 139.240-2(b)
Provided condition assessment report of all AGL equipment.
Reviewed compliance of AGL equipment and provided written statement for inclusion in the Aerodrome Manual.
Reviewed the Aerodrome Manual and offered suggested improvements.
Made recommendations to improve reliability of AGL system and rectify any Non-compliances.
Provided budgetary pricing for future upgrades