November 2018 Olympic Dam Airport Installation of LED Runway Lighting

Install LED Runway Lights

Replace Existing SITs and cables

Test and Commission

November 2018 Olympic Dam Airport 12 monthly Technical Inspection

Carried out 12 monthly Technical Inspection of the AGL equipment as per CASR 139.235-1. & CASR 139.240-2(b)

Provided condition assessment report of all AGL equipment.

Reviewed compliance of AGL equipment and provided written statement for inclusion in the Aerodrome Manual.

Levelled and cleaned PAPI boxes.

Inspected Runway and Taxiway Lighting.

Tested photometric performance of Apron Floodlighting.

Reviewed the Aerodrome Manual and offered suggested improvements.

Made recommendations to improve reliability of AGL system and rectify any Non-compliances.

Provided budgetary pricing for future upgrades

October 2017 Olympic Dam Airport 12 monthly Technical Inspection

Carried out 12 monthly Technical Inspection of the AGL equipment as per CASR 139.235-1. & CASR 139.240-2(b)

Provided condition assessment report of all AGL equipment.

Reviewed compliance of AGL equipment and provided written statement for inclusion in the Aerodrome Manual.

Levelled and cleaned PAPI boxes.

Inspected Runway and Taxiway Lighting.

Tested photometric performance of Apron Floodlighting.

Reviewed the Aerodrome Manual and offered suggested improvements.

Made recommendations to improve reliability of AGL system and rectify any Non-compliances.

November 2013 Olympic Dam Airport - Installation of IWDI Lighting

Replace the parafloods on the existing IWDI with a fitting that will achieve compliance with the new CASA requirements for IWDIs.

Procure equipment needed.

Installed new LED lights on IWDI

Tested and commissioned.

August 2011 Olympic Dam Airport - BHP Installation of PAPI and new AGL control system.

Design PAPI location to suit a Fokker 50 taking into account the unusual slope of the runway.

Design and install new Airport Lighting Control system  with Pilot Activated Lighting controller (PALC)

Review the local areas of significance and avoid these where possible when trenching.

Installation of pit and duct system

Installation of PAPI foundations.

Installation of PAPI

Test commission and flight check of PAPI and PAL.

November 2011 to 2017  Olympic Dam Airport - Audit and Condition assessment of Airfield Ground Lighting

Carried out 12 monthly Technical Inspection of the AGL equipment as per CASR 139.235-1. & CASR 139.240-2(b)

Provided condition assessment report of all AGL equipment.

Reviewed compliance of AGL equipment and provided written statement for inclusion in the Aerodrome Manual.

Reviewed the Aerodrome Manual and offered suggested improvements.

Made recommendations to improve reliability of AGL system and rectify any Non-compliances.

Provided budgetary pricing for future upgrades

 

 

 

 

 