February 2017 Portland Airport - Audit 12 Monthly Technical Inspection of AGL Facilities
Carried out 12 monthly Technical Inspection of the AGL equipment.
Lowered Apron Floodlights for clean and maintenance.
Cleaned and levelled all Runway Lights.
Fitted bird spikes to edge lights in an attempt to keep them clean.
Provided written report to satisfy CASA AGL requirements.
May 2015 Portland Airport - Installation of Medium Intensity Runway Lights
Design a Medium Intensity Runway Lighting (MIRL) System with circuit redundancy to suit Portland foggy conditions
Design and Install single sided PAPI
Installation of pit and duct system with inbuilt circuit redundancy
Installation of series isolation transformers (SITs) and 5kV cable
Installation of FAA style Elevated Edge Lights
Installation of taxiway centreline lights
Design new control system with Pilot Activated Lighting (PAL) controller.
Supply and install constant current regulators CCR for PAPI
Flight check and commissioning
October 2014 Portland Airport - Technical Inspection of Airfield Ground Lighting
Carried out 12 monthly Technical Inspection of the AGL equipment as per CASR 139.235-1. & CASR 139.240-2(b)
Provided condition assessment report of all AGL equipment.
Reviewed compliance of AGL equipment and provided written statement for inclusion in the Aerodrome Manual.
Reviewed the Aerodrome Manual and offered suggested improvements.
Made recommendations to improve reliability of AGL system and rectify any Non-compliances.
Provided budgetary pricing for future upgrades
September 2013 Portland Airport - Audit and Condition assessment of Airfield Ground Lighting
Carried out 12 monthly Technical Inspection of the AGL equipment as per CASR 139.235-1. & CASR 139.240-2(b)
Provided condition assessment report of all AGL equipment.
Reviewed compliance of AGL equipment and provided written statement for inclusion in the Aerodrome Manual.
Reviewed the Aerodrome Manual and offered suggested improvements.
Made recommendations to improve reliability of AGL system and rectify any Non-compliances.
Provided budgetary pricing for future upgrades
Note This report played a crucial role in achieving finance for the upgrade of all AGL at Portland.