Sunshine Coast Airport (Maroochydore)

January 2006 Sunshine Coast Airport Lift and replace Runway Edge Lights for Overlay works

Airport Electrical was working with Pioneer Road Services to progressively remove and replace the runway edge lights as part of the Runway Overlay Project.

 

May 2004 Sunshine Coast Airport  Audit and Condition assessment of Airfield Ground Lighting

Carried out 12 monthly Technical Inspection of the AGL equipment as per CASR 139.235-1. & CASR 139.240-2(b)

Provided condition assessment report of all AGL equipment.

Reviewed compliance of AGL equipment and provided written statement for inclusion in the Aerodrome Manual.

Reviewed the Aerodrome Manual and offered suggested improvements.

Made recommendations to improve reliability of AGL system and rectify any Non-compliances.

Provided budgetary pricing for future upgrades

 

April 2003 Sunshine Coast Airport Installation of PAPI

Airport Electrical was contracted by the Sunshine Coast Airport to undertake the installation of Precision Approach Path Indicator (PAPI) lighting. The project scope was for the design and installation of double sided PAPI at both ends of the runway. The existing TVASIS control system had to be modified to operate the newly installed PAPI. The old TVASIS cable were used to supply the new  PAPI.